Skip to main content

  | मौसम…

411 समाचार
Public archive edition · Attributed source reporting with original dates · AI drafts are excluded

411 REFERENCE · Wikibooks

Reconstruction/Deconstruction/Prep

Reference material by Wikibooks contributors. This retains its source identity and is not 411 news reporting.

The process by which a structure is prepared for deconstruction. Prep Suggested tools: Wrecking Bar Flashlight Wrench Shovel Flat Scoop Wheelbarrow Sledgehammer Claw Hammer Wire Cutters Flat Bar Hand Truck or Dolly with straps Suggested PPE: 3M Half-face respirator with p100 filters Gloves Boots Hard Hat Tyvek suit Safety goggles Accessesibility Open all exterior doors Clear all debris and obstructive overgrowth from exterior of structure Note: Avoid removal of exterior doors unless severely damaged or dysfunctional. Ventalation and Visibility Open windows and open interior doors Remove all window coverings Note: Do not break windows. Avoid removal of interior doors unless severely damaged or dysfunctional. Utilities Close water main valve Turn off main power switch Close gas main Debris Management Designate area for placement of debris on street in front of the structure Designate area for placement of salvageable items including personal items and building materials