Skip to main content

  | मौसम…

411 समाचार
Public archive edition · Attributed source reporting with original dates · AI drafts are excluded

411 REFERENCE · Wikibooks

ERP Internals/Modules/Manufacturing/Bill of Materials/Functions/Maintain Bill of Materials

Reference material by Wikibooks contributors. This retains its source identity and is not 411 news reporting.

Each line should be filled with Item Code, Quantity, Plan Scrap Quantity, Operation and Effective Date The BOM should avoid infinite loop. The ERP system should cover the function to detect the loop. Manufacturing/Bill of Materials/Functions/Maintain Bill of Materials