thumb|735x735px|Suburban Rail Loop route.Victoria's Big Build (n.d.). Suburban Rail Loop. Available at: https://bigbuild.vic.gov.au/library/suburban-rail-loop/fact-sheets/suburban-rail-loop-project-overview (Accessed on: 3rd May 2022)
The Melbourne Suburban Rail Loop (SRL), also known as Melbourne Orbital Rail, is a proposed 90km-long orbital railway network. Estimated to take over 25 years and cost more than AUD$50 billion, the project is expected to become Melbourne's busiest standalone line upon completion.Timna Jacks & Benjamin Preiss. (2018) State government announces massive suburban rail loop for Melbourne, the Age, August 28th, Available at: https://www.theage.com.au/national/victoria/state-government-announces-massive-suburban-rail-loop-for-melbourne-20180828-p5005r.html (Accessed on: 2nd May 2022)
The SRL comprises three sections: SRL East from Cheltenham to Box Hill, SRL North from Box Hill to Melbourne Airport, and SRL West from Melbourne Airport to Werribee. The 90km loop will connect every major rail line from the Frankston line to the Werribee line, via the airport, enhancing access to jobs, retail, education, health services, and other amenities. Three transport super hubs at Clayton, Broadmeadows, and Sunshine will connect regional services, allowing passengers outside Melbourne to reach suburban employment, hospitals, and universities without passing through the CBD. The project aims to alleviate congestion and reduce pressure on the existing transport network, creating up to 20,000 jobs during construction. The Suburban Rail Loop also presents an opportunity to plan for services, amenities, and infrastructure outside the central business district (CBD) for future generations.Victoria's Big Build (n.d.). Suburban Rail Loop: project overview. Available at: https://bigbuild.vic.gov.au/library/suburban-rail-loop/fact-sheets/suburban-rail-loop-project-overview (Accessed on: 1st May 2022)
The Suburban Rail Loop Authority (SLRA), established under the Department of Transport in September 2019, is responsible for the project's planning and development. The Government of Victoria opened the registration of interest (ROI) process for the project in June 2019. Construction will occur in several stages, with completion scheduled for 2050.The first stage, SRL East, will combine tunnel and surface rail and include:Victoria's Big Build (n.d.). Suburban Rail Loop East. Available at: https://engage.vic.gov.au/suburban-rail-loop-east (Accessed on: 2nd May 2022)
Twin 26-kilometre rail tunnels.
Six new underground stations, including four interchanges at existing stations (Cheltenham, Clayton, Glen Waverley, and Box Hill) and new stations at Monash and Burwood.
A transport super hub at Clayton for regional passengers.
A train stabling facility and power supply substation at Heatherton.
An emergency support facility at Mount Waverley, including an intervention and ventilation facility and backup control center.
A power supply substation at Burwood.
A dedicated fleet of new high-tech trains.
Preparation for SRL East's construction is well underway, with hundreds of geotechnical investigations, boreholes, and land surveys completed to inform planning and development
List of actors
Actor CategoryActorPhaseInterest/InvolvementGovernment - State"Operation Halo"AllProject conceptualisation (confidential, outside of standard government processes)Jacks, T., Le Grand, C. & Sakkal, P. (2021) Andrews’ biggest project was cooked up behind closed doors, The Age, August 15th, Available at:https://www.theage.com.au/politics/victoria/thrown-in-a-loop-how-daniel-andrews-biggest-project-was-cooked-up-behind-closed-doors-20210804-p58fsf.html (Accessed on: 1st May 2022)Development VictoriaAllProject planning (Property development and urban renewal)Infrastructure VictoriaAllIndependent advisory for Victoriana Infrastructure - bypassed in project conceptionMajor Transport Infrastructure Authority (MTIA) AllParent agency responsible for overseeing delivery of "Big Build" infrastructure projects in the state of Victoria (Victoria's Big Build) Suburban Rail Loop AuthorityAllResponsible for planning and delivery of the Suburban Rail Loop Public Transport VictoriaAllResponsible for the operation of Public Transport in the state of Victoria.
Input into interchanges and service coordination.Department of Environment, Land, Water and PlanningAllLand use policy.EPA
Part of the Department for Energy, Environment and Climate ChangeAllSets standards for air quality.
Standards for disposal of affected soil from construction sites.
Standards for disposal of excavated soil.Government - FederalAllPotential source of funding. Rejected at at March 31st, 2022.Sakkal, P. (2022) Our way or the railway: Canberra rejects $11.5b suburban loop request, The Age, April 1st, Available at:https://www.theage.com.au/politics/victoria/our-way-or-the-railway-canberra-rejects-11-5b-suburban-loop-request-20220331-p5a9mv.html (Accessed on: 1st May 2022)Government - Local GovernmentKingstonSRL EastRepresenting local residents in planning, traffic and pedestrian disruption. Effects on local recreation areas.MonashSRL EastWhitehorseSRL East; SRL NorthManninghamSRL NorthBanyuleSRL NorthDarebinSRL NorthMorelandSRL NorthHumeSRL North; SRL WestBrimbankSRL WestWyndhamSRL WestCommunityWestfield SouthlandSRL EastClose proximity to SRL Cheltenham to Southland.
Will have overpass connection to SRL.The Glen Shopping CentreSRL EastClose proximity to SRL Glen Waverly.
Traffic impacts.Box Hill Central Shopping Centre SRL East; SRL NorthExisting surburban station is underneath shopping centre.Public Transport Users AssociationAllAdvocacy for public transport users in the state of Victoria.Bicycle NetworkAllInput/advocacy into bicycle parking facilities and access.LandownersAllWhile the SRL is primarily underground there will be impacts on landowners (potential acquisitions) around stations and other surface facilities.Chinese CommunitySRL EastTranslated communications.Greek CommunitySRL EastTranslated communications.Recipients of SRL Community GrantsAllUpgrades to local facilities near SRL stationsInstitutionsMonash UniversitySRL EastStation in close proximity to station
Construction impacts (traffic)
Major destination for usersDeakin UniversitySRL EastLa Trobe University SRL NorthBox Hill InstituteSRL East; SRL NorthMelbourne Airport SRL North; SRL WestConstruction impact to airport operations.VendorsKPMGAllFinancial AdvisorRailway-technology.com (2019) Suburban Rail Loop, Melbourne Available at:https://www.railway-technology.com/projects/suburban-rail-loop-melbourne/ (Accessed on: 1st May 2022)Aurecon Jacobs Mott MacDonald (AJM) Joint VentureAllTechnical and engineering services, planning advice, sustainability and environmental services, and communication and stakeholder engagement strategy.Aurecon Pty Ltd (2021) Suburban Rail Loop Available at:https://www.aurecongroup.com/projects/transport/suburban-rail-loop (Accessed on: 1st May 2022)Construction - Not appointedAllOperational equipment (e.g. rolling stock, signalling) - Not appointedAll
Timeline
+TimeEventsAug 2018Prior to the State election, the Victorian Government announced that it will start work on Suburban Rail Loop if re-electedPreiss, Benjamin (14 August 2018). "Victorian Labor promises biggest transport building program in Australia". The Age. Retrieved 30 April 2022.. As a result, the SRL will transition Melbourne's rail network from its current radial status to an orbital network. June 2019Registrations of Interest were called for enabling the Government to assess market capacity to deliver the project. This ROI process is not a pre-qualification for any formal procurement process.Timothy, Neesam (June 17, 2019). "Victoria opens ROI process for Suburban Rail Loop". Railway Technology.Sept 2019The Victorian Government established the Suburban Rail Loop Authority (SRLA) to manage and lead development on the project.Victoria's Big Build (n.d.). About the Suburban Rail Loop Authority. Retrieved 30 April 2022.Nov 2019The Victorian Government announced the SRL will be serviced by a new fleet of trains that will be four to five carriages long and be capable of travelling at higher speeds than the existing fleet. The shorter train design will also result in shorter station platforms.Premier of Victoria(24 November 2019). "New Dedicated Trains For Standalone Suburban Rail Loop".Aug 2021SLRA opened a Request for Tender (RFT) for Technical Advisory Services to support the development and delivery of the Suburban Rail Loop project, closing on 6 October. SLRA noted that the scope of Technical Advisory Services may expand subject to further approvals during the term of its engagement.Aug 2021The Victorian Government released the project's Business and Investment Case. The document outlines estimated costs and timelines for SRL East and North. The document detailed changes to the staging of the project, which will be delivered as SRL East, SRL North and SRL West.Victoria's Big Build (n.d.). Business and Investment Case. Retrieved 30 April 2022.Sept 2021The Victorian Government introduced the Suburban Rail Loop Bill 2021 (Vic) to Parliament. The Bill seeks to formally establish the Suburban Rail Loop Authority (SRLA) and confers on the SRLA the authority to plan, deliver, and operate the Suburban Rail Loop and manage associated developments.Peter Henley, Simon Bailey, Jessica Lee AND William Deng (14 Oct 2021). "Suburban Rail Loop Bill delivers for major Victorian Government transport projects". Clayton UTZ.Oct 2021The Parliament of Victoria passed the Suburban Rail Loop Bill 2021. The Bill formally establishes the Suburban Rail Loop Authority (SRLA) and confers the authority for the SRLA to plan, deliver, and operate the Suburban Rail Loop and manage associated developments.Feb 2022The Suburban Rail Loop Authority (SRLA) issued a Request for Tender (RFT) for the establishment of a Planning and Delivery Services Panel to support SRLA's Rail and Infrastructure Delivery Division. The services covered in the RFT are split into four Panel Group Categories, including Technical Services; Project Delivery Services; Land Planning, Environment Sustainability Services; and Precinct Planning and Development Services. The RFT closed on 25 March 2022.
Maps of locations
Existing Melbourne Railway Network
thumb|745x745px|Melbourne Rail Network MapOpenStreetMap (2022), OpenStreetMap, Available from: https://www.openstreetmap.org/#map=11/-37.8347/145.0394&layers=T Accessed 1 May 2022.
The map to the right highlights the radial nature of Melbourne's existing suburban rail network.
The heavy rail network can be identified by lines with designated stations (red dots) while the tram network (light rail) is show by thinner lines without stations.
SRL East
thumb|Suburban Rail Loop - East|left
+SRL East StationsVictoria's Big Build (2022) SRL East, Accessed 3 May 2022, Available at: https://bigbuild.vic.gov.au/projects/suburban-rail-loop/srl-eastPrecinct MapStation Section DiagramCheltenhamSRL East - Cheltenham PrecinctSRL East - Cheltenham StationClaytonSRL East - Clayton PrecinctSRL East - Clayton StationMonashSRL East - Monash PrecinctSRL East - Monash StationGlen WaverleySRL East - Glen Waverley PrecinctSRL East - Glen Waverley StationBurwoodSRL East - Burwood PrecinctSRL East - Burwood StationBox HillSRL East - Box Hill PrecinctSRL East - Box Hill Station
SRL North
thumb|Suburban Rail Loop - North|noneVictoria's Big Build (2022) SRL North, Accessed 3 May 2022, Available at: https://bigbuild.vic.gov.au/projects/suburban-rail-loop/srl-north
As at May 3rd, 2022 the detailed route and station designs for SRL North had not been released.
SRL West
thumb|Suburban Rail Loop - West|noneVictoria's Big Build (2022) SRL West, Accessed 3 May 2022, Available at: https://bigbuild.vic.gov.au/projects/suburban-rail-loop/srl-west
As at May 3rd, 2022 the detailed route and station designs for SRL West had not been released.
Policy Issues
Prohibitive Cost
In late August 2018, Victorian Premier Daniel Andrews proposed a $50 billion suburban rail loop connecting all major rail lines from east to west via Melbourne Airport. Due for completion in 2050. As the first phase of the SRL project, SRL East is expected to cost between $30.0 to $34.5 billion with the standalone line planned to be running by 2035. $2.5 billion was provided by the Victorian Government for planning and development of SRL and for Initial and Early Works on SRL East. In addition, The Victorian Government provided a further $9.3 billion for SRL East in late 2021.Benita Kolovos. (2021) Daniel Andrews defends cost of $35 billion first stage of suburban rail line - with full project to take 35 years, Mailonline, November 25th, Available at:https://www.dailymail.co.uk/news/article-10241417/Daniel-Andrews-defends-cost-35-billion-stage-suburban-rail-line.html (Accessed on: 3nd May 2022)
SRL project is extremely expensive both in terms of time and cost. The initial budget was a staggering $50 billion, so the plausibility and practicality of SRL was questioned by many experts. The Grattan Institute's transport and cities program director Marion Terrill said she had concerns about the Government's lack of transparency. She also warned that mega projects like the Suburban Rail Loop had a greater risk of cost blow outs.Richard Willingham. (2020) Melbourne's new Suburban Rail Loop to start at Cheltenham, $2.2 billion announced for early works, ABC News, November 16th, Available at:https://www.abc.net.au/news/2020-11-16/billions-to-be-spent-melbournes-suburban-rail-loop/12886936 (Accessed on: 3nd May 2022) Considering that SRL is a complex mega project and lacks specific follow-up data support, cost overruns are prone to occur. The rail loop’s benefit-to-cost ratio (BCR) can not be guaranteed and taxpayers should expect higher returns from what is the largest infrastructure project ever conceived by a state government, especially given the multibillion-dollar cost blowouts facing other major builds.Timna Jacks. (2021) Scrutiny of rail loop costs raises questions on value, The Age, August 23th, Available at:https://www.theage.com.au/national/victoria/deep-drill-into-rail-loop-costs-raises-questions-on-methods-and-value-20210820-p58km5.html (Accessed on: 3nd May 2022)
Lack of Financial Support
The SRL cost is initially estimated to be above 50 billion, and the main financing and financing (F&F) strategies are:
Victorian Government funding (state budget)Victoria's Big Build (n.d.). SRL-Business-and-Investment-Case. Available at:https://bigbuild.vic.gov.au/__data/assets/pdf_file/0004/578281/SRL-Business-and-Investment-Case.pdf
Australian Government funding (Federal funding)
New value capture arrangements, including state-backed land development proceeds.
In the SRL project, the cost-benefit ratio (BCR) was calculated using unconventional parameter calculations and the lack of traffic and economic planning in the business case. At the same time, considering the lack of engineer reports and subsequent detailed budget analysis, the federal government cannot provide financial support for the project . So the Victorian government may face huge financial pressure.
Worries of Social and Environmental Impact of Construction
The current SRL East project will inevitably lead to a number of environmental and social issues as its route passes through densely populated areas in Melbourne's east. Although a substantial portion of the route would be built underground, prolonged construction would cause noise, vibration and pollution problems to surrounding residents.
Follow-up Execution Issue
Since the SRL project is a multi-decade mega-project, it can not be completed during the Daniel Andrews term of office. Considering the financial cost and time cost, as well as possibility of different governance strategies, it is difficult to guarantee that the subsequent government can continue to promote the construction of the SRL project.
How to Integrate with The Existing Transport System
In addition to operating as a standalone line, the SRL is also designed to connect passengers to existing lines. This means waiting times need to be minimized. In order to better integrate into the existing traffic system, the frequency of SRL is worth discussing whether the car of SRL is compatible with the existing rail system. Easy interchange to other rail, tram and bus lines is also important alongside high frequencies.Daniel Bowen. (2021) Things the Suburban Rail Loop needs to succeed, December 5th,Available at:https://www.danielbowen.com/2021/12/05/things-srl-needs-to-succeed/ (Accessed on: 3nd May 2022)
Narrative
Melbourne Orbital Rail Construction Stages
Areas connected by SRL include: Cheltenham, Clayton, Monash, Glen Waverley, Burwood, Box Hill, Doncaster, Heidelberg, Bundoora, Reservoir, Faulkner, Broadmay Doss, Melbourne Airport, Sunshine and Werribee.
As well as providing rail links to the airport, the project will create three "transportation super-hubs" in Clayton, Broadmeadows and Sunshine City, connecting regional passengers to the Melbourne Rail Rail Link.
Given the size of the railway loop, construction will be completed within a few decades. One is to build the eastern and northern sections of the southern line. The Western Section will be planned and constructed in conjunction with the Melbourne Metro Tunnel, the Melbourne Airport Rail Link and the Western Section Rail Scheme.
The initial cost of SRL East and North is between $30 billion and $55 billion. At this time, a timetable and estimated cost to complete SRL West has not been provided.
The first stage of the suburban rail loop - SRL East - is a 26km metro corridor between Cheltenham in the south and Box Hill in the north. The line will include six stations, including new interchanges with existing heavy rail stations in Cheltenham, Clayton, Glen Waverley and Box Hill, as well as new stations in Monash and Burwood. Clayton's new overpass will serve as a "transportation super-hub" connecting regional passengers to the railroad loop.
Six subway stations will be located between 17 and 23 meters below the street and will be built in a "bottom-up" fashion. The entrance location will be close to the existing train station and central facilities
Financing
The suburban rail loop project is expected to cost A$50 billion ($34 billion). The project has been awarded $300 million ($205 million) in the 2019-20 Victorian State Budget for a comprehensive business case, planning and pre-construction work.
Ridership and Fleet Details
In 2031, it is estimated that 210000 passengers will take the urban rail ring line every day, and about 400000 passengers will take the ring line in 2051.
The estimated travel time in the future includes 25 minutes between Clayton and bandola, 25 minutes between Boxhill and the airport, 35 minutes between Broadmeadows and Monash, 45 minutes between Frankston and the airport, and 45 minutes between eltonham and the airport.
The suburban ring line will be equipped with high-tech special trains. Each train can carry up to five carriages to supplement the shorter platform, so as to minimize the walking distance to the station. The fleet will also ensure that passengers can get on and off easily.
Discussion Questions
Are there other technologies and transport modes that could more efficiently the deliver transport outcomes?
Is the breakdown between SRL East, North and West phases the best way to effectively deliver the project? How else could it be phased?
Given most of the SRL stations are interchanges to the existing suburban rail network, does their design facilitate this purpose (easy and frictionless transitions).
How to ensure that the next government can continue to advance the SRL follow-up plan
Are existing SRL programs practical and reasonable given the enormous cost? or it is just a showcase of the current government?
Extra Readings
SRL Business and Investment Case Key Findings : https://bigbuild.vic.gov.au/__data/assets/pdf_file/0005/578273/SRL-Business-and-Investment-Case-Key-Findings.pdf
The Age investigative article in SRL conception : https://www.theage.com.au/politics/victoria/thrown-in-a-loop-how-daniel-andrews-biggest-project-was-cooked-up-behind-closed-doors-20210804-p58fsf.html
Will the 50b suburban rail loop shape the Melbourne we want::https://www.sgsep.com.au/assets/main/Will-the-50b-suburban-rail-loop-shape-the-Melbourne-we-want.pdf
Suburban Rail Loop Summary Document:https://www.development.vic.gov.au/__data/assets/pdf_file/0013/60007/SRL1459-Suburban-Rail-Loop-Summary-Document-DAY-2_32PP-WEB_V27.pdf