The nihongo|Fukushima II Nuclear Power Plant|福島第二原子力発電所|Fukushima Dai-Ni Genshiryoku Hatsudensho|extra=Fukushima II NPP, 2F}}, or Fukushima Dai-ni (dai-ni means "number two"), is a nuclear power plant located on a 1,500,000acre site Tepco site Text and answers to the Fukushima II plant quiz. Page 8. in Fukushima Prefecture, Japan. The Tokyo Electric Power Company (TEPCO) runs the plant.
After the 2011 Tōhoku earthquake and tsunami, the four reactors at Fukushima II scrammed (automatically shut down).http://www.neimagazine.com/story.asp?sectioncode=132&storyCode=2059127 Japan initiates emergency protocol after earthquake Nuclear Engineering International March 11, 2011 March 11, 2011
Japan's worst nuclear accident occurred at TEPCO's Fukushima I Nuclear Power Plant, or Fukushima Dai-ichi, an 11.5|km boundary to boundary road journey to the north,http://maps.google.com.au/maps?f=d&source=s_d&saddr=Japan+%28Centrale+nucl%C3%A9aire+de+Fukushima+Daini%29&daddr=37.3431023,141.0278567+to:fukushima+daiichi&geocode=FRRzOQIdt89nCCFAhFkr6W_jPQ%3BFX7POQIdEOpnCCmRMBRhEd4gYDGIQQNCxAescg%3BFeH9OgIdav9nCCkZlJkJON0gYDEU4gYhdWDE7A&hl=en&mra=ltm&dirflg=d&sll=37.334269,141.022568&sspn=0.109055,0.154324&ie=UTF8&ll=37.370566,141.012611&spn=0.109003,0.154324&t=h&z=13&via=1 Fukushima II Nuclear Power Plant to Fukushima I Nuclear Power Plant google 5 April 2011 after the same March 11 earthquake.
Description
All reactors in the Fukushima II Nuclear Power Plant are Boiling Water Reactor|BWR-5 typehttp://www-pub.iaea.org/MTCD/publications/PDF/CNPP2010_CD/pages/AnnexII/tables/table2.htm Reactors in operation December 31, 2009 IAEA March 12, 2011 with electric power of 1,100 MW each (net output: 1,067 MW each).
The reactors for units 1 and 3 were supplied by Toshiba, and for units 2 and 4 by Hitachi. Units 1–3 were built by Kajima while the unit 4 was built by Shimizu Corporation|Shimizu and Takenaka Corporation|Takenaka.http://nuctrans.org/Nuc_Trans/locations/daini/daini.htm Nuclear Reactor Maps: Fukushima-Daini Council for Security Cooperation in the Asia Pacific March 14, 2011 The design basis accident for an earthquake was between 0.42 g-force|g (4.15 m/s2) and 0.52 g (5.12 m/s2) and for a tsunami was 5.2 m.http://www.world-nuclear-news.org/RS_Fukushima_faced_14-metre_tsunami_2303113.html Fukushima faced 14-metre tsunami March 24, 2011 World Nuclear News March 24, 2011
Unit First criticality Installation costs (yen/MW) Reactor supplier Architecture Construction Containmenthttp://www.tepco.co.jp/nu/f2-np/intro/outline/outline-j.html 1 31/07/1981 250,000,000ToshibaToshibaKajima Mark 2 2 23/06/1983 230,000,000HitachiHitachiKajima Mark 2 advanced 3 14/12/1984 290,000,000ToshibaToshibaKajima Mark 2 advanced 4 17/12/1986 250,000,000http://www.nuketext.org/yasui_cost.html 原発の発電コスト Nuketext.org October 28, 2008 March 16, 2011HitachiHitachiShimizuTakenaka Corporation|Takenaka Mark 2 advanced
Electrical connections
The Fukushima Daini plant is connected to the rest of the power grid by the Tomioka Line (富岡線) to the Shin-Fukushima (New Fukushima)
substation.Tepco Annual Report 2003. Page 24. (Japanese).
Events
1989 incident
In January 1989, an impeller blade on one of the reactor coolant pumps in Unit 3 broke at a weld, causing a large amount of metal debris to flow throughout the primary loop. As a result, the reactor was shut down for a considerably long time.March 2011
2011 earthquake and tsunami
The March 11, 2011 Tōhoku earthquake and tsunami|2011 Tōhoku earthquake resulted in maximum horizontal ground accelerations of 0.21 g (2.10 m/s2) to 0.28 (2.77 m/s2) at the plant site, which is well below the design basis. http://www.tepco.co.jp/en/press/corp-com/release/11040103-e.html The record of the earthquake intensity observed at Fukushima Daiichi Nuclear Power Station and Fukushima Daini Nuclear Power Station (Interim Report) TEPCO 1 April 2011 All four units were Scram|automatically shut down immediately after the earthquake, according to Nuclear Engineering International, and the diesel engines were started to power the reactor cooling.Insight to Fukushima engineering challenges http://www.world-nuclear-news.org/RS_Insight_to_Fukushima_engineering_challenges_1803112.html March 18, 2011 March 19, 2011 World Nuclear News TEPCO estimated that the tsunami that followed the earthquake and inundated the plant was 14 meters high which is more than twice the designed height. This flooded the pump rooms used for the essential service water system transferring heat to the sea, the ultimate heat sink of the reactors.
While the cooling system for unit 3 was undamaged, the other reactors were affected. The cooling systems remained operational, but heated up due to the lack of a heat sink. The high pressure coolant injection (HPCI) system (powered by reactor steam) was used as additional cooling.
On March 12, the Nuclear reactor technology|cooling system for three reactors (numbers 1, 2 and 4) at the torus had topped 100 °C between 05:30 and 06:10 Japan Standard Time|JST,reports for reactor 1, reactor 2, and reactor 4 of Tokyo Electric, received 11:50 JSTWinter, Michael "Cooling system fails at 3 reactors at another Japanese nuclear plant" USA Today, March 11, 2011, 6:01 EST. rendering all cooling systems (depending on temperature difference between the torus and the reactor) ineffective.
Image:Fukushima_accidents_overview_map.svg|thumb|328px|Fukushima I and II Nuclear Accidents Overview Map showing evacuation and other zone progression and selected radiation levels.
The coolant systems in the pump room were repaired and activated in Units 1, 2 and 4 in the days following the emergency shutdown after cooling could recommence Coolant temperatures below 100 °C (cold shutdown) were reached in reactor 2 about 34 hours after the emergency shut down (SCRAM).http://www.world-nuclear-news.org/RS_Cold_shutdowns_at_Fukushima_Daini_1403112.html Cold shutdowns at Fukushima Daini 2011 March 14 World Nuclear News March 14, 2011 Reactors 1 and 3 followed at 1:24 and 3:52 on March 14 and Reactor 4 at 7:00 on March 15.All Fukushima No.2 plant reactors safely halted http://www3.nhk.or.jp/daily/english/15_24.html Tuesday, March 15, 2011 11:58 +0900 (JST) March 15, 2011 The loss of cooling water at reactors 1, 2 and 4 was classified a level 3 on the International Nuclear Event Scale (serious incident) by Japanese authorities as of March 18.http://www.iaea.org/newscenter/news/tsunamiupdate01.html IAEA Update on Japan Earthquake Japanese authorities have assessed that the loss of cooling functions in the reactor Units 1, 2 and 4 of the Fukushima Daini nuclear power plant has also been rated as 3. All reactor Units at Fukushima Daini nuclear power plant are now in a cold shut down condition.. March 16, 2011http://www.huffingtonpost.com/t/flash-japan-nuclear-safet_2_48671013055111168.htmlhttp://www.meti.go.jp/press/20110318009/20110318009.html 東北太平洋沖地震による福島第一原子力発電所及び福島第二原子力発電所の事故・トラブルに対するINES(国際原子力・放射線事象評価尺度)の適用について Japanese Nuclear and Industry Safety Agency Ministry of Economy, Trade and Industry March 18, 2011 March 18, 2011
Officials made preparations for release of pressure from the plant on March 12.http://www.reuters.com/article/2011/03/12/japan-quake-tepco-radiation-idUSTKG00706720110312 RPT-TEPCO releasing pressure at one Fukushima reactor Reuters March 11, 2011http://www.world-nuclear-news.org/RS_Battle_to_stabilise_earthquake_reactors_1203111.html Battle to stabilise earthquake reactors World Nuclear News World Nuclear News March 12, 2011 March 12, 2011 As of March 20, however, no pressure release had been reported.http://www.tepco.co.jp/en/press/corp-com/release/11031311-e.html Press release 11 TEPCO March 13, 2011
An evacuation order was issued to people living within {{|3|km}} of the plant,http://www.world-nuclear-news.org/RS_Battle_to_stabilise_earthquake_reactors_1203111.html Battle to stabilise earthquake reactors, update 2 World Nuclear News March 12, 2010 subsequently expanded to {{|10|km|abbr=on}}. http://www3.nhk.or.jp/daily/english/30_42.html Smoke from Fukushima Daini nuclear plant
Air traffic was restricted in a {{|10|km|abbr=on}} radius around the plant, according to a NOTAM.http://www.ourairports.com/airports/RJSS/pilot-info.html Pilot inion for Sendai Airport March 12, 2011 March 12, 2011 These zone were superseded by the 20 km evacuation and 30 km no-fly zones around Fukushima I on March 12 and 15, respectively.April 2011
TEPCO announced that a worker who had been seriously injured by the earthquake, and trapped in the crane operating console of the exhaust stack was transported to the ground at 5:13 p.m. and confirmed dead at 5:17 p.m.http://www.iaea.org/newscenter/news/tsunamiupdate01.html IAEA update on Japan Earthquake March 12, 2011 March 12, 2011http://www.tepco.co.jp/en/press/corp-com/release/11031233-e.html Press Releases TEPCO TEPCO March 12, 2011 March 12, 2011:"We sincerely pray for the repose of his soul."http://www.asahi.com/national/update/0312/TKY201103120197.html 福島第二原発で作業員1人死亡 第一では2人が不明 asahi.com March 12, 2011 March 20, 2011http://sankei.jp.msn.com/region/news/110312/fks11031209070025-n1.htm 東電、協力会社社員3人死亡 2人不明 福島と茨城 The Sankei News March 12, 2011 March 20, 2011http://news.tv-asahi.co.jp/ann/news/web/html/210312201.html 【地震】第二原発 閉じ込められた従業員は死亡 ANN News March 12, 2011 March 20, 2011
Smoke was escaping from one of the buildings on 30 March 2011. It was emitted from equipment which supplies electrical power to a motor pump that collects outdoor water and stopped after workers disconnected the motor.http://www3.nhk.or.jp/daily/english/30_42.html Smoke from Fukushima Daini nuclear plant
By March 15th, all four reactors of Fukushima II reached cold shutdown which remained non-threatening through April.http://allthingsnuclear.org/post/4283747180/3-week-update-on-japans-nuclear-crisis 3 Week Update on Japan's Nuclear Crisis April 2, 2011 April 2, 2011
References
30em
External links
Tokyo Electric Power Company 東京電力
Webcam showing Fukushima I Nuclear Power Plant
Official site c/o Tokyo Electric Company 東京電力・福島第一原子力発電所
TEPCO News Releases http://www.tepco.co.jp/en/press/corp-com/release/index-e.html Tokyo Electric Power Company
IAEA Alert Log http://www.iaea.org/press/ International Atomic Energy Agency
All Things Nuclear]