Skip to main content

  | मौसम…

411 समाचार
Public archive edition · Attributed source reporting with original dates · AI drafts are excluded

411 REFERENCE · Wikibooks

Diablo Canyon Nuclear Power Plant: The WikiBook/Overview of DCPP earthquake issues

Reference material by Wikibooks contributors. This retains its source identity and is not 411 news reporting.

Diablo Canyon (Nuclear) Power Plant, located on the water's edge in San Luis Obispo County California, was originally designed to withstand a 6.75 magnitude earthquake from four faults, including the nearby San Andreas and Hosgri faults,http://www.time.com/time/magazine/article/0,9171,917988,00.html Time Energy: A Nuclear Horror February 9, 1976 July 14, 2010 but was later upgraded to withstand a 7.5 magnitude quake. David Sneed Diablo Canyon workshop to focus on earthquakes The San Luis Obispo Tribune August 9, 2011 http://www.sanluisobispo.com/2010/08/08/1244213/diablo-canyon-workshop-september.html It has redundant seismic monitoring and a safety system designed to shut it down promptly in the event of significant ground motion. center|700px|Global earthquake epicenters, 1963–1998]] Introduction Diablo Canyon (Nuclear) Power Plant (DCNPP/DCPP)is located proximal to the Los Osos, Hosgri, San Andreas and Shoreline earthquake faults. Many of these were discovered late in the process of design and construction, necessitating redesign. Construction errors compounded the delays and expense before the plant went online and began producing. Thereafter, discovery of the Shoreline fault caused a round of controversy leading Assemblyman Sam Blakeslee to introduce legislation mandating 3-D seismic studies. The plant is up for relicensing and, in the Fukushima aftermath, there is renewed opposition due in part to public perception that the risk of earthquake or tsunami make the plant unsafe. On the other hand, company officials contend that the plant is inherently safe from tsunami due its situation on an 85 foot coastal bluff. Re-licensing is contingent upon consistency with the Coastal Act and thus review by the California Coastal Commission, however seismic issues are more properly within the purview of the Nuclear Regulatory Commission. Much to the chagrin of some parties, such as US Senator Markey, the NRC in June 2011 announced that it had already completed its Safety Evaluation Report (SER) for the plant. http://pbadupws.nrc.gov/docs/ML1115/ML11153A103.pdfa4nr.org Public controversy Critics contend that the Diablo Canyon (Nuclear) Power Plant was built so close to a set of geological fault lines that it is for all practical purposes to be regarded as built "directly over" an earthquake fault. http://www.mothersforpeace.orgThis is the Hosgri fault which was discovered while the plant was under construction, and led to massive redesign. More recently, the Shoreline fault was discovered, a few hundred meters offshor, sparking renewed interest in the controversy. Early geologist perspectives From a more scientific perspective, the geology is as follows:" Three Pliocene-Miocene marine sedimentary units dominate the geology of Diablo Canyon: the Pismo Formation, the Monterey Formation, and the Obispo Formation. According to a Lawrence-Berkely report entitled Geologic Investigation of a Potential Site for a Next-Generation Reactor Neutrino Oscillation Experiment – Diablo Canyon, San Luis Obispo County, CA Geologic Investigation of a Potential Site for a Next-Generation Reactor Neutrino Oscillation Experiment – Diablo Canyon, San Luis Obispo County, CA|Celia Tiemi Onishi, Patrick Dobson, and Seiji Nakagawa|Earth Sciences Division, Lawrence Berkeley National Laboratory, Berkeley, CA 94720, USA|Steven Glaser and Dom Galic|Department of Civil and Environmental Engineering, University of California, Berkeley, CA 94720 USAthe area is tectonically active, located east of the active Hosgri Fault and in the southern limb of the northwest trending Pismo Syncline." The Obispo Formation is made up of marine and volcaniclastic sedimentary rocks. http://www.ce.berkeley.edu/~glaser/documents/theta13_tunnel_finalreport.pdf http://www.kcet.org/updaily/socal_focus/environment/31573-diablo-canyon-nuclear-power-plant.html The Diablo Canyon Nuclear Power Plant, a 48-Year Odyssey March 25, 2011 KCET May 20, 2011 http://www.ksby.com/news/is-diablo-canyon-prepared-for-possible-earthquake-/ Is Diablo Canyon prepared for possible earthquake? March 14 2011 KSBY.com May 20, 2011 http://www.fox40.com/news/headlines/ktxl-californias-two-nuclear-plants-near-fault-lines-20110314,0,3265997.storyhttp://www.newsmax.com/InsideCover/Newsom-California-Diablo-canyon/2011/03/17/id/389759http://www.capradio.org/articles/2011/03/25/is-california-underestimating-quake-threat-to-nuclear-plants In 1985, the USGS of the Department of Interior published a reportEmpirical prediction of near-source ground motion for the Diablo Canyon power plant site, San Luis Obispo County, California [microform] / Kenneth W. Campbell Campbell, Kenneth W Geological Survey (U.S.) 1989 Dept. of the Interior, U.S. Geological Survey : [Books and Open-File Reports Section, distributor] English by Kenneth Campbell, at that point in the history of earthquake science probably a "deterministic study", entitled "Empirical prediction of near-source ground motion for the Diablo Canyon power plant site, San Luis Obispo County, California". |publisher = Dept. of the Interior, U.S. Geological Survey |publication-place = Denver, Colo |author = Kenneth W Campbell |url = http://openlibrary.org/books/OL13612932M/Empirical_prediction_of_near-source_ground_motion_for_the_Diablo_Canyon_power_plant_site_San_Luis_Obispo_County_California |title = Empirical prediction of near-source ground motion for the Diablo Canyon power plant site, San Luis Obispo County, California |publication-date = 1989 }} More recent studies include probabilitist seismic hazard assessment. Seismic Information Workshop|September 8-9, 2010|San Luis Obispo, CA|Agenda of Nuclear Regulatory Commission seismic source characterization studies Various techniques are used to identify faults. These include: aeromagnetic survey marine magnetic survey seismic reflection profiling seismicity sub-bottom profiling geologic mapping geodetic survey gravity survey Seismic Information Workshop|September 8-9, 2010|San Luis Obispo, CA|Agenda of Nuclear Regulatory Commission Fuel rod assembly vulnerability In response to concern that ground acceleration, or shaking, could cause spillage of submerged fuel rod assemblies which, upon exposure to air, could ignite, PG&E and NRC regulators insist that the foregoing scenario is anticipated and controlled for, and that there is no basis to anticipate spillage. Diablo Canyon Independent Safety Committee’s Evaluation of Pressurized Thermal Shock and Seismic Interactions for a 20-Year License Extension at the Diablo Canyon Nuclear Power Plant http://www.dcisc.org/pts-public-release.php Diablo Canyon Independent Safety Committee 2011 March 18, 2011 Additional seismic studies are in process, however completion of those studies is not a condition precedent to reissuance of the operating licenses for the two onsite units. In The World of Nuclear Power Crisis http://www.mindfully.org/Nucs/TMI-LifeMay79.htm Life Magazine May 1979 23–30 July 14, 2010In 1994, a probablistic seismic report was released Review of Diablo Canyon Probabilistic Risk Assessment [microform] / prepared by G.E. Bozoki ... [et al.] Bozoki, G. E U.S. Nuclear Regulatory Commission. Division of Safety Issue Resolution Brookhaven National Laboratory 1994 Division of Safety Issue Resolution, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission : Supt. of Docs., U.S. G.P.O. [distributor] EnglishDiablo Canyon Independent Safety Committee’s Evaluation of Pressurized Thermal Shock and Seismic Interactions for a 20-Year License Extension at the Diablo Canyon Nuclear Power Plant http://www.dcisc.org/pts-public-release.php Diablo Canyon Independent Safety Committee 2011 March 18, 2011 Additional seismic studies are in process, however completion of those studies is not a condition precedent to re-issuance of the operating licenses for the two onsite units. In The World of Nuclear Power Crisis http://www.mindfully.org/Nucs/TMI-LifeMay79.htm Life Magazine May 1979 23–30 July 14, 2010 Risk estimates The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Diablo Canyon was 1 in 23,810, according to an NRC study published in August 2010. Bill Dedman Bill Dedman What are the odds? US nuke plants ranked by quake risk msnbc.com March 17, 2011 http://www.msnbc.msn.com/id/42103936/ April 19, 2011 http://msnbcmedia.msn.com/i/msnbc/Sections/NEWS/quake%20nrc%20risk%20estimates.pdf At a community forum in San Luis Obispo, NRC, PG&E and academic experts presented information on seismic risks to the general public. This included a review of both older deterministic and more contemporary probablistic studies. Seismic Information Workshop|September 8-9, 2010|San Luis Obispo, CA|Agenda of Nuclear Regulatory Commission Post-Fukushima developments In April 2011, in the wake of the Fukushima nuclear incident in Japan, PG&E asked the NRC not to issue license renewals until PG&E can complete new seismic studies, which are expected to take at least three years. http://www.baycitizen.org/pge/story/diablo-canyon/ Seismic Uncertainty at Diablo Canyon John Upton March 17, 2011 The Bay Citizen 2011-04-19 http://online.wsj.com/article/SB10001424052748704529204576257302591577840.html Diablo Plant Delays License Bid for Quake Study Ben Casselman Stephen Power April 12, 2011 The Wall Street Journal 2011-04-19 The ongoing (as of 6/2011) seismic studies were recommended by the California Energy Commission and are approved and funded by the California Public Utilities Commission. PG&E Letter DCL-11-047|April 10, 2011|To NRC Coomunity based organizations and activists contend that the plant is inherently unsafe due to the earthquake faults, the lack of knowledge about them, and a putatively inadequate track record of government and private industry in the anticipation and control of such hazards. Letter of Judith Evered, Women's International League for Peace and Freedom| To Nuclear Regulatory Commission|Entered public record agenda item # 3 Late distribution County of Santa Barbara| June 16, 2011 http://www.mothersforpeace.orga4nr.org References